Estimating support for Chicago projects
Chicago work frequently means renovation and interior build-outs in existing buildings, along with mixed-use and commercial construction. The city's own building code is the starting point for scope.
- Construction cost estimating. Budget and bid-focused cost breakdowns with documented assumptions, inclusions and exclusions.
- Quantity & material takeoffs. Measured quantities from your drawings, organized by the trades or assemblies you price.
- Commercial & retail estimating. Ground-up commercial, retail build-outs, tenant improvements and mixed-use scopes.
- Residential & renovation estimating. New homes, additions, remodels and renovations, with existing and new work separated.
- Trade-specific estimating. One subcontractor package, scoped to your inclusions and bid sheet.
See how our construction estimating works, or read takeoff vs. cost estimate if you are not sure which deliverable you need.
Local factors to confirm in a Chicago estimate
These are public references worth checking before you rely on a Chicago number. Each one is a question for your drawings, specifications and permit path. None of them is a legal or code determination.
The Chicago Building Code (Title 14B)
Chicago enforces its own Chicago Building Code (Title 14B of the Municipal Code), based on the 2018 International Building Code with Chicago-specific provisions. Confirm the drawings were prepared to Chicago requirements rather than a generic model code.
City of Chicago — Building code onlineLocal references checked November 2026. Codes and permit procedures change, so confirm the governing edition and requirements with the authority having jurisdiction for your project address.
What to send for a Chicago estimate
- Project address and jurisdiction. The Chicago Department of Buildings, or the suburban municipality for sites outside the city. Give the actual site city and state, not your office address.
- Drawings and specifications. The current set, its revision or issue date, and the code basis noted on the sheets.
- Scope and deliverable. Trades or packages, inclusions and exclusions, and whether you need quantities, costs or both.
- Deadline and pricing basis. Your bid or budget date, contract type, and any supplier quotes you already hold.
The full list is in what to send for an estimating quote.
Chicago estimating questions
Do you have an office in Chicago?
No. Noble Stone is based in Plano, Texas, and prepares estimates for Chicago projects remotely from your drawings and specifications. Scope, deliverables and schedule are agreed before work begins.
Which code edition will the estimate assume?
The scope shown in your drawings and specifications. We do not certify code compliance; if the drawings predate a code change or the governing edition is unclear, we document it as an assumption or clarification for your design team and the authority having jurisdiction.
How do I share drawings?
Start with the inquiry form: project type, city, the documents you have and your deadline. Don't upload confidential plans through the public form. Plan sharing is arranged once the scope is discussed.
What does an estimate cost?
Fees and turnaround depend on drawing completeness, project size, the number of trades and the deliverables. We confirm a project-specific scope, fee and schedule; no fixed price or turnaround is assumed.

